Partial Resource Outage for Library Hardware

Hardware that is housed in our Library datacenter will need to be taken down on Monday, October 4th at 11:00am.  The work is scheduled to last until 5:00pm, but we expect to be finished before then.  We will need this time to make some needed configuration changes to the network.  The following queues will be affected:

  • rcnib.q
  • aetm.q
  • chandra.q
  • brca.q
  • bigmem.q
  • enviro.q
  • canaima.q

Any jobs that are running at the time of the take down may be stopped, but we’re hoping to avoid causing any applications to be terminated.  The work should mostly result in a brief period of low job throughput.

You must be logged in to post a comment.